Medical Office Building Envelope Repair
Location
Dexter, MO
Owner
St. Francis Healthcare System
Architect / Engineer
N/A
Services Provided
Construction Manager at Risk
Contract Amount
$1.6M
Every aspect of the project was executed with meticulous attention to detail. Communication was consistently excellent, from the superintendent down to the front office. I highly recommend RIHC for any future projects and am confident in their ability to deliver exceptional results.
Project Summary
Saint Francis Health System (SFHS) entrusted Robinson with the rehabilitation of their Dexter Medical Office Building’s exterior. The building, spanning 40,000 square feet, features a construction comprised of masonry, EIFS, and glass. Since its completion in 2016, the building has been plagued by water leaks, prompting SFHS to undertake extensive repair efforts.
Robinson’s mandate involved the comprehensive restoration of the building’s exterior, including:
- Removal and replacement of 12,400 square feet of brick.
- Removal and replacement of 13,500 square feet of EIFS.
- Repairing the exterior water and air barrier.
- Removal and resealing of windows.
With RIHC as the Construction Manager, SFHS aimed to address the Dexter Medical Office Building envelope issues efficiently and effectively, ensuring minimal disruption to ongoing operations while delivering high-quality repairs within the specified timeframe. With meticulous attention to detail and a focus on quality craftsmanship, Robinson ensured the project’s successful completion, safeguarding the building’s integrity for years to come.