Wastewater Pretreatment Facility
Location
Litchfield, MN
Owner
First District Association (FDA)
Engineer
Lee & Company, LLC
Services Provided
Construction Manager at Risk
Contract Amount
$33M
Project Summary
Robinson provided construction management services for a nearly $60 million industrial wastewater pretreatment facility supporting First District Association’s dairy processing operations in Litchfield, Minnesota. Designed to process up to 1.75 million gallons per day of high-strength wastewater, the new facility reduces the organic and wastewater load discharged to the City of Litchfield’s municipal treatment system while providing capacity to support FDA’s continued operations.
The project included a process building, anaerobic digestion and digestate treatment systems, biosolids handling, gas treatment and renewable energy infrastructure, along with extensive site development and supporting utilities. Methane generated through the wastewater treatment process is captured and beneficially used, including the production of renewable natural gas. The facility represents a significant investment in both wastewater infrastructure and sustainable energy recovery.
Construction included substantial concrete and foundation work, beginning with the installation of more than 1,000 geopiers. A major project milestone was the construction of a massive digester utilizing Octaform stay-in-place concrete forming technology. The structure required an approximately 1,800-cubic-yard wall pour and, at the time of construction, became the largest Octaform tank in the world.
Executing a project of this scale in central Minnesota required extensive cold-weather planning and coordination. Crews continued foundation construction through temperatures approaching -30°F and encountered native soils frozen more than four feet deep. To protect two newly constructed tanks containing approximately 11 million gallons of water during the winter, the team developed a temporary fail-safe system that circulated warm effluent water approximately 1,500 feet from the adjacent treatment plant at a rate of 750 gallons per minute. Insulated, walkable floating tank covers provided additional protection, successfully preventing the stored water from freezing under extreme conditions.
Throughout construction, Robinson coordinated closely with First District Association, engineers, trade partners and specialty contractors while adapting to evolving design requirements and maintaining progress in challenging conditions.