West Park Mall Redevelopment – PetSmart Tenant Buildout
Location
Cape Girardeau, MO
Owner
River City Centre, LLC
Architect / Engineer
The Lawrence Group
Services Provided
Construction Manager at Risk
Contract Amount
Included in Phase 1 Redevelopment
Project Summary
RIHC Contracting completed a full tenant buildout for PetSmart as part of the West Park Mall redevelopment project. Work included demolition and replacement of slab areas, trench drains, curbs, wet-area construction, plumbing systems, HVAC, electrical systems, storefront systems, polished concrete flooring, porcelain tile, and fire sprinkler systems.
The project also included specialty animal-care construction such as FRP panel systems, grooming stations, fish room infrastructure, adoption areas, and durable wet-area finishes designed to support high-moisture service environments.
Extensive coordination between plumbing systems, trench drainage, waterproofing systems, and specialty animal-care fixtures was required throughout construction. Heavy-duty ABS rotomolded doors were installed in high-moisture and animal service areas to provide long-term durability and performance.